Stage 2 documents

A selection of documents produced in Stage 2 - Collaborative Design can be found below.

 

St Kilda Triangle Masterplan

 

  • St Kilda Triangle Masterplan (PDF, 10MB)
  • St Kilda Triangle Masterplan - summary booklet (PDF, 1.2MB)
  • St Kilda Triangle Cultural Charter (PDF, 650KB)
  • Stage 2 Engagement Report (PDF, 3.4MB)
  • Officer Responses to Draft Masterplan Feedback (PDF, 225KB)
  • St Kilda Triangle Prospectus (PDF, 1.2MB)
  • St Kilda Triangle Preliminary Business Case (PDF, 2.7MB)
  • Comparative Analysis for Cultural Tourism Attractors, Essential Economics 2016. (PDF, 1.05MB)

 

Draft Masterplan

  • Summary booklet (PDF, 1.5MB)
  • Interim to Draft Masterplan - information sheet (PDF, 90KB)
  • 1.0 - Introduction (PDF, 210KB)
  • 2.0 - Existing Conditions (PDF, 7.6MB)
  • 3.0 - St Kilda Triangle Cultural Charter (PDF, 110KB)
  • 4.0 - Masterplan Response (PDF, 8.4MB)
  • 5.0 - Single Cultural Institution (PDF, 360KB)
  • Appendix A - Community Engagement (PDF, 4.5MB)
  • Appendix B - Preliminary Costings (PDF, 150KB)
  • Appendix C - Traffic Engineering Report (PDF, 1.9MB)
  • Draft Masterplan - text only / accessible version (DOCX, 75KB)

 

Interim Masterplan

  • Interim Masterplan (PDF, 16MB)
  • Appendices (PDF, 6.6MB)

Masterplan Co-Design Workshops


  • Co-Design Workshop 1 Participant Information Pack (PDF, 2.5MB)
  • Co-Design Workshop 2 Recap Preparation Pack (PDF, 1.2MB)
  • Design Brief Revision 1 (PDF, 580KB)

 

Public Space Co-Design Workshop

  • Co-Design Workshop Participant Information Pack (PDF, 2MB)